® .Geomorphology 32 2000 109­128 Channel instability in a forested catchment: a case study from Jones Creek, East Gippsland, Australia Tim J. Cohen ) , Gary J. Brierley 1 School of Earth Sciences, Macquarie Uniersity, North Ryde, NSW 2109, Australia Received 22 October 1998; received in revised form 15 May 1999; accepted 12 July 1999 Abstract Jones Creek, a forested sub-catchment of the Genoa River, Victoria, Australia has experienced channel metamorphosis induced by a series of floods since 1971. In the flood of record, in 1971, the Genoa River widened by up to two times at the confluence with Jones Creek. This effectively shortened the course of Jones Creek, resulting in a lagged tributary response. Incision and bed steepening during floods in 1975 and 1978 triggered significant changes in channel form along Jones Creek. Channel changes between 1972­1997 resulted in a four-fold increase in cross-sectional area. Channel depth increased by up to 1.5 m, but has subsequently refilled by around 0.6 m. Initially, incision resulted in increased stream power as a result of increased mean depth, while sinuosity was maintained. This was followed by channel widening, a reduction in sinuosity and a continued increase in slope. Estimated stream power remains high as the channel continues to laterally adjust. This study highlights the dynamic nature of tributary­trunk stream relationships in a cut-and-fill landscape, demonstrating how trunk stream adjustments can induce profound tributary instability in a forested subcatchment. Channel widening of the trunk stream primed the tributary for change. Bedlevel incision and increases in bedslope breached the threshold of landscape stability in this steep alluvial tributary. Three periods of channel change can be identified, reflecting the complex response of the system to channel incision. Rather than developing simple cutoffs, Jones Creek now exhibits a range of lateral adjustment and realignment features. Responses to external disturbance provide insights into `natural' recovery mechanisms in this forested setting. Lateral adjustment and associated sediment deposition have been accompanied by rapid rates of vegetation colonisation and stabilisation of realignment features, effectively reducing the volume of sediment that is available to be reworked through the channel network. q 2000 Elsevier Science B.V. All rights reserved. Keywords: channel instability; bed-level incision; forested catchment; channel recovery; riparian vegetation; Australia ) Corresponding author. School of Geosciences, University of Wollongong, Wollongong, NSW, 2522, Australia. Fax: q61-02- 4221-4250. ® .E-mail addresses: tjc12@uow.edu.au T.J. Cohen , ® .gbrierli@laurel.ocs.mq.edu.au G.J. Brierley . 1 Fax: q61-02-9850-8427. 1. Introduction To date, nearly all studies of the geomorphology of the rivers in southeastern Australia have been framed in landscapes which have been dramatically altered in the period following European settlement. As such, our understanding of controls on the charac- ter and behaviour of these rivers may be skewed by 0169-555Xr00r$ - see front matter q 2000 Elsevier Science B.V. All rights reserved. ® .PII: S0169-555X 99 00079-3 ( )T.J. Cohen, G.J. BrierleyrGeomorphology 32 2000 109­128110 the significant alterations in boundary conditions that these landscapes have experienced. For example, in virtually all instances in which channel metamorpho- sis has been documented, there has been extensive clearance of riparian and floodplain vegetation, mod- ifying the geomorphic effectiveness of flood events ® .Brooks and Brierley, 1997 . Although the Aus- tralian landscape is characterised by fluvial systems that have been destabilised since European settle- ment, there is little documented evidence of the mechanisms that induce the breaching of thresholds. In this study, the term channel stability refers to a change in channel pattern and form process associa- tion as a result of an altered sediment load or dis- ® .charge regime Chorley et al., 1984 . This study presents data on the metamorphosis of an alluvial tributary in a relatively undisturbed forested setting and isolates controls on landscape stability. Our understanding of channel instability largely stems from theoretical and experimental work and a range of case studies carried out in the northern ®hemisphere Schumm and Lichty, 1963; Schumm et al., 1984; Osterkamp and Costa, 1987; Simon, 1989, .1992; Schumm, 1993 . Most of these studies have been performed in landscapes that have been sub- jected to a history of human impact. It is only recently that literature on fluvial geomorphology has highlighted the unique character of the Australian ®fluvial landscape cf., Tooth and Nanson, 1995; .Brierley et al., 1996 . The theoretical and docu- mented processes on channel instability exemplified in the northern hemisphere need to be tested in an Australian setting. This issue is compounded by the fact that very few, if any, studies of channel instabil- ity have demonstrated how fluvial systems in tem- perate environments unaffected by human activity respond to large `natural' disturbances. For example, ® . ® .while Prosser et al. 1994 , Brierley and Fryirs 1998 ® .and Fryirs and Brierley 1999 have demonstrated the distinct cut and fill nature of certain alluvial landscape settings in southeastern Australia, it has been difficult to ascertain the character of incisional processes in forested settings. To our knowledge, no studies have documented the character and mecha- nisms of channel incision and landscape recovery in catchments with an intact riparian forest. While a significant volume of literature from the northern hemisphere provides a basis with which to assess the role of riparian vegetation and woody debris on ®channel dynamics in a forested setting cf., Keller .and Swanson, 1979; Nakamura and Swanson, 1993 , much of this work has been in fluvial settings which are fundamentally different to landscape settings in southeastern Australia. Jones Creek is a forested tributary of the Genoa catchment, which straddles the New South Wales­ Victoria border in southeastern Australia. Since 1972 Jones Creek has undergone significant changes in channel geometry and planform. In this period, the catchment has been subjected to `natural' distur- bances such as a series of floods and the 1983 Ash Wednesday fire. This study documents how Jones Creek has responded to these `natural' disturbances. Insights are provided into recovery mechanisms that follow large scale channel instability in settings with an intact riparian zone. The role of within-channel vegetation, large woody debris and sediment reten- tion are examined as integral components for the onset of channel recovery, thereby adding to the theoretical notions on channel behaviour following incision. 2. Regional setting Jones Creek drains a 31 km2 subcatchment of the ® .Genoa River in far East Gippsland Fig. 1 . Up- stream of Jones Creek confluence, the Genoa River is bedrock-controlled, but the confluence zone itself ® .termed Wangarabell Reach is characterised by an area of valley expansion resulting in discontinuous floodplain formation. The geology of the upper part of Jones Creek catchment comprises Devonian gran- ites and Ordovician metasedimentary rocks. Much of the middle part of the catchment comprises Tertiary sediment consisting of unconsolidated coarse sand and gravels with clay rich sands. The lower 3.5 km of Jones Creek has an alluvial channel with a sinuosity of 1.58, mean bankfull width of approximately 33 m, and mean depth of 2 m. Although the forested floodplain increases in width downstream from 50 m to 500 m towards the ® .Genoa River confluence Fig. 2 , there are no sys- tematic downstream changes in channel width, mean ( )T.J. Cohen, G.J. BrierleyrGeomorphology 32 2000 109­128 111 Fig. 1. Location map showing Jones Creek within Wangarabell Reach in the Genoa River catchment. depth, cross sectional area, sinuosity or bed material size. The average floodplain slope in the lower sec- tion of the catchment is 0.0075 mrm, while overall channel slope within the study area is 0.0045 mrm. Jones Creek is an emphemeral system and is charac- terised by widespread bank erosion, with numerous examples of bank collapse and tree fall. Various abandoned channels are evident near the channel and on the floodplain. Jones Creek is a mixed load system, transporting silt, sand and gravel. At present, Jones Creek trans- ports significant volumes of sediment forming sand sheets, point bars and bank attached bars. The bed ® ® .material size assessed using the Wolman 1954 .technique averages 40 mm in the upper 2.5 km of the alluvial reach, but increases in size up to 320 mm adjacent to the Genoa River confluence, where older Genoa River gravels are reworked. The presence of these larger clasts indicates that the Genoa River has adjusted its position through the confluence zone in the past, with these coarser materials extending up to 400 m upstream from the confluence. ( )T.J. Cohen, G.J. BrierleyrGeomorphology 32 2000 109­128112 Bank materials are extremely variable, ranging from clay-rich uniform bank exposures to medium sands and gravels in channel fill sequences. Bankside vegetation in the study area often has exposed root zones which are well above present-day bedlevels. ®Large amounts of large woody debris LWD -- defined as wood )10 cm in diameter and )1 m in .length and log jams are evident within the channel. ®Based on rainfall records from Wroxham 10 km . ®NE of Jones Creek and Timbillica 25 km NE of .Jones Creek , the mean annual rainfall at Jones Creek is approximately 900 mm. Continuous flood discharge records for the Genoa River downstream of Wangarabell are available from mid 1971 on- ® .wards the `gorge' -- station 221210 . Based on the annual series from 1972­1996, the Genoa River has a steep flood frequency curve as indicated by a flash flood magnitude index of 0.74, which is high by ®world standards Erskine 1992, 1993; Erskine and .I.D.&A., 1997 . Based on monthly and maximum 48-h rainfall at Wroxham since 1971, periods of above average rainfall can be discerned for 1971­ 1978, 1983­1988 and 1991­1995. These periods of high rainfall have been related to anecdotal and historical evidence to establish a flood record for Jones Creek. Approximately 90% of Jones Creek catchment falls within Coopracambra National Park. There are no records of extensive timber extraction from the catchment in the last 25 years. Prior to this, the catchment has had a history of small scale timber extraction in the form of spot milling. The catchment is dominated by regrowth dry sclerophyll vegetation on the hillslopes and floodplain with more mesic communities in the gullies and headwaters. Species composition across the floodplain shows consider- able spatial variability with a mosaic of vegetation patches. The tall open forest is dominated by Euca- ® .lyptus iminalis subsp. iminalis Manna Gum , E. ® . ®elata River Peppermint and E. baueriana Blue .Box . The mid-storey in the study area is dominated ® .by Acacia mearnsii Black Wattle , A. melanoxylon ® . ®Blackwood and Pomaderris aspera Hazel Po- Fig. 2. Study area within Jones Creek, highlighting the contempo- rary planform and position of cross sections along with the 1996 longitudinal profile. ( )T.J. Cohen, G.J. BrierleyrGeomorphology 32 2000 109­128 113 .maderris . Ground cover is dominated by Poa ensi- ® .formis Sword Tussock-grass , Lomandra longifolia ® .Spiny-headed Matrush and Blechnum nudum ® .Fishbone Water fern . ®Based on tree ages dendrochronological evidence .on A. melanoxylon , rainfall records from the 1800s, ® .and historical information, Chesterfield et al. 1990 estimated that significant fires occurred in Jones Creek catchment in the early 1800s, late 1800s or early 1900s, 1952 and 1983. The intensity and per- centage of the catchment burnt in fires prior to 1983, however, is unknown. The 1983 Ash Wednesday fire was the most intense fire on record in East Gipps- land, and brought about profound changes to vegeta- ®tion composition in many areas Chesterfield et al., .1990; Loyn et al., 1992 . All of Jones Creek catch- ment was intensely burnt in 1983, including warm ®temperate rainforest in the headwaters D. Cameron, .pers. comm. . After the 1983 fires the density of Acacia sp. and Eucalyptus sp. increased dramati- cally in the headwater areas, with densities ranging y1 y1 ®from 250 ha to 100,000 ha Chesterfield et al., .1990 . Prior to the 1983 fire, vegetation in the study ®area was of a more mesic association D. Cameron, .pers. com. . Riparian communities were significantly affected by the 1983 fires, with a shift towards a more sclerophyll based association. This resulted in a floodplain vegetation community that is now charac- terised by areas with high stem density of dry sclero- phyll species. There are no quantifiable data on the direct impacts of the 1983 fire on channel processes such as sediment supply or changes to the hydrologi- cal regime. 3. Methods ®Aerial photographic interpretation at a scale of .1:4000­1:5000 , along with field mapping of geo- ®morphic and vegetation attributes including den- .drochronology of A. mearnsii growing in cutoffs , provide the basis for documenting the nature and timing of channel changes in Jones Creek since 1967 ® .see Cohen, 1997 for further details . Many of the channel cutoffs in the study area are not fully pre- served. Rather, they are infilled, inset features at the margins of the wide channel. These features are not classic channel cutoffs and have been termed re- alignment features. Realignment features reflect lat- eral channel adjustment, in contrast to channel cut- offs which represent bends or sections of the channel that have been separated from the contemporary ® .channel Fig. 3 . Based on their morphology and position, two categories of palaeochannels were identified in the field. These are termed the 1983 and 1972 channels. Identification of 1983 cutoff channels and realign- ment features was initially made from the 1983 ® .aerial photo taken after the fire . These were con- firmed in the field by their dimensions and eroded asymmetric cross-sectional morphology, their prox- imity to the contemporary channel, and the lack of vegetation older than 14 years. The 1972 channels are characterised by smaller hydraulic dimensions with symmetrical cross-sections. These channels are not clearly shown on any of the photographs, al- though the 1967 photograph indicates fragments of their presence and rough dimensions. The 1972 channels are considered to be representative of chan- nel form in Jones Creek prior to the latest period of channel change. Cross-sections of 1972 and 1983 palaeochannels were surveyed to measure their cross sectional area. Prior bedlevels of Jones Creek were determined using a range of indicators. Most evidence is pro- vided by the depth of abandoned sections of the 1972 channel and 1983 realignment features and channel cutoffs. This has been defined by the marked boundary between fine grained channel fill and coarse ® .bedload cf., Erskine et al., 1992 . A further indica- tor of prior bedlevel is provided by a series of gravel lag outcrops perched above the contemporary chan- nel bed. Finally, prior water tables evidenced by gleying and blocky fabric on bank exposures are ®indicative of bed degradation see Cohen, 1997 for a .full description of prior bedlevel assessment . Each of these indicators was surveyed in to the present thalweg bedlevel to assess bedlevel adjustments throughout the study area. Eighteen channel cross sections were surveyed along the study reach. Twelve of these sections were resurveys of cross-sections emplaced by the then East Gippsland River Management Board in 1993. The longitudinal profile of Jones Creek was also resurveyed at 30 m increments along the thalweg ® .Fig. 2 . ( )T.J. Cohen, G.J. BrierleyrGeomorphology 32 2000 109­128114 Fig. 3. Schematic example of a lateral realignment feature in contrast to a section of the 1983 channel that has been separated from the channel. Realignment features reflect lateral adjustment of the channel planform and shift in the focus of bend migration. Sedimentological attributes of bed and bank mate- rials were analysed at each of the surveyed cross sections. Samples were wet sieved at 63 mm to determine the percent siltrclay. Sediment storage on the channel bed was assessed at three positions at each cross section using a bed-level probe, with the depth to a coarse gravel lag used to assess volume of sediment stored on the channel bed. Sediment stor- age in all realignment features and channel cutoffs was also assessed. 4. Channel changes on the Genoa River and Jones Creek, 1967­1998 Aerial photographs from 1967, 1972, 1986, 1992 and 1994 indicate that the Genoa River and its tributaries in Wangarabell Reach have undergone considerable change in form since 1971. These changes were initiated by a sequence of floods in the 1970s. The enlarged 1967 aerial photograph of Genoa River­Jones Creek confluence shows no evidence for active erosion along the Genoa River. At this time, the Genoa River was around 35­40 m wide, and was characterised by regularly spaced, large ® .pools see Fig. 4A . The tributary confluence was dissected, and there were a series of vegetated bars up and downstream of the confluence. In 1967, Jones Creek was a small, indistinct tributary with dense riparian and floodplain vegeta- tion. Bankfull widths measured from the 1967 air photo range between 12­15 m. Field evidence con- ®firms this, with measured palaeochannels termed .1972 channels in this study having bankfull widths of 10­18 m. In 1971, the Genoa River experienced the largest flood on record since European settlement. This flood had an estimated peak instantaneous discharge of 2611 m3 sy1 , 12.4 times greater than the mean ® .annual flood Erskine, 1992, 1993 . The 1971 flood resulted in floodplain inundation, sand splay deposi- tion on the floodplain, extensive channel margin ()T.J.Cohen,G.J.BrierleyrGeomorphology322000109­128115 Fig. 4. Genoa River at Wangarabell Reach showing the changes in channel morphology from 1967 to 1979. Arrow denotes position of Jones Creek confluence. Note the destabilisation of Jones Creek by 1979. Flow is from left to right. ( )T.J. Cohen, G.J. BrierleyrGeomorphology 32 2000 109­128116 stripping and changes in channel planform in the lower reaches of the Genoa River. Around 5 ha. of floodplain and channel margin land were removed between Jones Creek confluence and Wangarabell ® . ®Creek confluence Erskine, 1992, 1993 see Fig. .4B . Channel widening of the right bank occurred at Jones Creek confluence, resulting in bankfull dimen- sions of 106­132 m. This indicates a 230% increase in channel width since 1967. Vegetated and non- vegetated bars at Jones Creek confluence were com- pletely removed, while vegetation was stripped from bars upstream of, and on the bank opposite to, the confluence of Jones Creek. Although the 1971 flood resulted in extensive changes in channel form on the Genoa River, the ®tributaries within Wangarabell Reach Jones Creek .and Wangarabell Creek remained stable. However, the geomorphic responses of the Genoa River and associated tributaries in Wangarabell Reach to a series of closely spaced, moderate to high magnitude floods in 1971, 1975 and 1978 were spatially and temporally variable. The 1975 and 1978 floods on the Genoa River, which had estimated recurrence intervals of 6.5 and 13 years, respectively, main- tained erosion along the Genoa River, and resulted in the destabilisation of the tributaries in Wangarabell Reach, including Jones Creek and Wangarabell Creek. Fig. 4C shows the Wangarabell Reach in 1979, highlighting the widened character of the Genoa River with continued bank erosion at the confluence with Jones Creek. It was not until the subsequent floods of 1975 and 1978 that tributary instability occurred It is difficult to ascertain a definite planform for Jones Creek prior to it becoming destabilised. How- Table 2 1972 bedlevel indicators ® ® .1972 Palaeochannel 1972 Channel bedlevel q m : ® .location above present day thalweg; y m : .below present day thalweg ® .Urs of XS 10 Auger q0.964 ® .Urs of XS 10 Auger q0.795 ® .Adjacent to XS 10 Pit q0.721, q0.764 ® .Drs of XS 10 Auger q0.886 ® .Drs of XS 10 Auger q0.807 ® .Drs of XS 10 Auger q0.788 ® .Drs of XS 10 Pit q0.722 ® .Urs of XS 4 Auger q1.004 ® .Urs of XS 4 Auger q1.448 ® .Drs of XS 2 Auger q0.611 a Gravel lag urs of XS 2 q0.821 a Gravel lag urs of XS 2 q0.628 Mean 1972 bedlevel q0.843 a Outcropping gravel lag in channel. Point of bedlevel is taken as the bedload channelrfill contact boundary. ever, insights can be gained from a series of narrow and symmetrical palaeochannels, which have a sinu- osity of approximately 2.1­1.71, mean bankfull ®width of 15.1 m and a mean depth of 1.15 m see .Table 1 . Supporting evidence for these channel dimensions is provided from anecdotal sources. For ® .example, D. Cameron pers. comm. identified Jones Creek as having a channel that was small and indis- tinct in the mid 1970s, with permanent pools and dense mesic riparian vegetation. All bedlevel indica- tors from 1972 paleochannels are above the bedlevel ® .of the contemporary channel Table 2 , ranging from 0.61­1.45 m above present day bedlevel, with a mean of 0.84 m. Table 1 Channel dimensions for Jones Creek 1972­1997 Mean 1972 Channel 1983 Channel 1993 Channel 1997 Channel % Change 1972­1997 2® .Cross sectional area m 17.2 35.9 60.1 66.1 q385 ® .Bankfull width m 15.1 16 32.3 33.3 q120 ® .Mean bankfull depth m 1.15 2.23 1.86 1.99 q73 ® .Max. bankfull depth m 3 4.1 3.8 3.5 q16 WrD 5 3.9 8.5 9.5 q78 Sinuosity 2.1­1.71 1.73 1.56 1.58 y7.6 WrD ratio calculated using maximum channel depth. Increase in mean depth between 1993 and 1997 is a function of largeincreases in cross sectional area at cross section 10 and 8, rather than increases in absolute depth. ( )T.J. Cohen, G.J. BrierleyrGeomorphology 32 2000 109­128 117 Channel expansion of the Genoa River in the 1971 flood effectively shortened the length of Jones Creek by 75­100 m. On the 1979 aerial photograph ® .Fig. 4B Jones Creek had estimated bankfull dimen- sions that range from 15­31 m, with a sinuosity of 1.71. The study area was actively eroding, with some reaches characterised by within-channel bars and debris accumulations. It is clear, however, that chan- nel changes between 1972­1979 were not spatially uniform. ®On the 1983 aerial photograph taken after the .fire the channel was actively eroding its banks, with a sinuosity of 1.73 and bankfull dimensions that ranged from 18­32 m. Channel width was highly variable, with areas undergoing cutoffs having wider bankfull conditions. Measured mean bankfull width was 16 m, while mean bankfull depth was 2.23 m ® .Table 1 . Detailed field analysis of channel cutoffs and realignment features indicate that the active ® .1983 channel was asymmetrical with near vertical upper banks, in stark contrast to the symmetrical 1972 channel. The period of tributary instability between 1972­ 1983, as constrained by the aerial photograph record, has been termed the first phase of channel change in Jones Creek. Following a series of inferred floods on Jones Creek between 1972­1979, the mean depth of Jones Creek increased by 93% as a result of bedlevel incision, while cross sectional area increased by 108%. Although erosion was widespread in this first phase of channel change, sinuosity was maintained, and the width:depth ratio decreased as the channel deepened. Between 1983­1992, cutoffs and channel realign- ment occurred throughout the study area with a reduction of sinuosity from 1.73 in 1983 to 1.56 in 1992, most likely during a series of floods between 1983­1988. Dendrochronological evidence confirms that colonisation of 1983 channel cutoffs and re- alignment features occurred from late 1984 to early 1985. Bedlevel indicators from 1983 realignment features in the middle of the study area indicate that 1983 bedlevels ranged from 0.236­1.515 m below present day thalweg bedlevel, with a mean of 0.66 m ® .Table 3 . Mean channel width in this period in- creased by approximately 100% to 32.3 m and cross ® .sectional area increased by a further 67% Table 1 . Mean depth decreased by approximately 17% as the Table 3 Bedlevel indicators for 1983 channels ® ® .1983 Realignment featurer 1983 Channel bedlevel q m : ® .cutoff location above present day thalweg; y m : .below present day thalweg ® .Urs of XS 10 Auger y0.368 ® .Urs of XS 10 Pit y0.27 ® .Drs of XS 10 Auger y0.76 ® .Drs of XS 10 Auger y1.515 ® .Urs of XS 9 Auger y0.236 ® .Drs of XS 9 Pit y0.673 ® .Urs of XS 7 Auger y0.687 Adjacent to XS 7 y0.8 Mean 1983 bedlevel y0.66 Point of bedlevel is taken as the bedload channelrfill contact boundary. channel became wider and shallower along with large increases in the width:depth ratio. These changes are referred to as the second phase of chan- nel change in Jones Creek. Fig. 5 highlights the character of planform changes in a segment of the study area between 1972 and 1997. Aerial photographs from 1992­1994 indicate lit- tle change in channel planform of Jones Creek. The last three months of 1995 were characterised by high maximum monthly rainfall producing a bankfull event on Jones Creek on the 5th and 6th of Decem- ber with an estimated discharge of around 130 m3 sy1 . The 1995 flood induced little change in plan- form in the study reach. A flood in June 1998, which was approximately three quarters bankfull, resulted in a cutoff in the upper part of the study area. The period from 1992 to the present has been charac- terised by continued channel expansion, bar deposi- tion and lateral adjustment and is identified as the third phase of channel change in Jones Creek. Bank- full widths and cross sectional area increased slightly ® .with small fluctuations in mean depth see Table 1 . Straightening is still operative with 1­2 cutoffs in the process of occurring. The contemporary be- haviour of Jones Creek is characterised by localised increases in cross sectional area, with shifts in the erosional foci being the dominant process as exem- plified by Fig. 6. Data from Tables 2 and 3, summarised in Fig. 7, indicate that Jones Creek was characterised by bedlevel incision in the first phase of channel change ()T.J.Cohen,G.J.BrierleyrGeomorphology322000109­128118 Fig. 5. Planform changes in the middle of the study area of Jones Creek between 1972 and 1997, showing nature of lateral adjustment as Jones Creek progressively straightened. Symbols indicate location of bedlevel indicators. ( )T.J. Cohen, G.J. BrierleyrGeomorphology 32 2000 109­128 119 Fig. 6. Cross sectional changes in the middle section of Jones Creek between 1993 and 1997 highlighting localised increases in cross sectional area and lateral adjustment of channel geometry. ® .1972­1983 , but that aggradation occurred from 1983­1997. These data on bedlevel adjustments are seemingly confirmed by analysis of prior water ta- ® .bles Table 4 , which range from 0.48 to 1.83 m above present day bedlevel, with a mean of 1.29 m. This is approximately 45 cm above the 1972 mean bedlevel, indicating the range of water level fluctua- tions in the 1972 channel. While these data display a range of elevations above the 1972 mean bed eleva- tion, they still confirm that the mean watertable was above the mean 1972 bedlevel, indicating watertable lowering in the incision process. Based on these bedlevel assessments, it is estimated that channel changes between 1972­1983 resulted in up to 1.5 m of bedlevel incision, whereas an average of 0.66 m of bed aggradation occurred between 1983 and 1997. The assessment of bedlevel indicators highlighting channel incision is supported by aerial photographic evidence of channel straightening and channel short- ening on Jones Creek between 1972 and 1983. While periods of channel change can be identified for Jones Creek, changes on the Genoa River since 1979 have involved extensive deposition of bank-at- tached bars opposite the confluence of Jones Creek. The other dominant process in this period has been the recovery of instream and bank vegetation follow- ®ing the 1983 fires cf., Schumm and Lichty, 1963; .Friedman et al., 1996 . This has resulted in a nar- rower channel of similar character to that which was evident in 1967. Finally, detailed field survey of channel dimen- sions, along with augering and probing of sediment thickness on the channel bed and in realignment features and cutoffs, has enabled a summary assess- ment of the alluvial sediment budget of the study ® .reach to be performed see Table 5 . From the three periods of channel change identified in Jones Creek, between 1972 and 1997, it is estimated that a total of 171,100 m3 of material have been eroded. Sediment analysis of bank material suggests an estimated mean ratio of sand to mud of 58:42 and it is likely that the mud fraction has been predominantly flushed through ® 3 .the system representing 71,862 m of sediment . Of the remaining 99,200 m3 of sediment, an estimated 29,950 m3 of sand are stored in point bars and realignment features, with another 3170 m3 of sand stored on the bed of Jones Creek. The total of 33,120 m3 of material stored within the channel zone repre- sents 33.4% of the sand fraction eroded during the three periods of channel change. Of this volume, 65% is consolidated in vegetated realignment fea- ()T.J.Cohen,G.J.BrierleyrGeomorphology322000109­128120 Fig. 7. Jones Creek 1996 longitudinal profile showing location of prior bedlevels highlighting that prior to destabilisation bedlevels were on average 0.84 m above present day thalweg elevation, while 1983 bedlevels were on average 0.66 m below present day bedlevel. ( )T.J. Cohen, G.J. BrierleyrGeomorphology 32 2000 109­128 121 Table 4 Prior watertable bedlevel indicators ® ® .Prior watertable Prior watertable q m : ® .location above present day thalweg; y m : .below present day thalweg Urs of XS 10 q1.814 Urs of XS 10 q1.83 Urs of XS 10 q1.381 Urs of XS 10 q1.467 Urs of XS 9 q1.13 Urs of XS 9 q0.771 Drs of XS 9 q0.478 Urs of XS 2 q1.436 tures. Following incision, an estimated 66,000 m3 of sand have been flushed through Jones Creek into the Genoa River, resulting in increased rates of aggrada- tion in the trunk stream. Perhaps the most significant aspect of this alluvial sediment budget is that re- alignment features and cutoffs within the enlarged channel of Jones Creek have already trapped up to 33% of sands released upon channel expansion. Trapping of these deposits is considered to form the primary platform for subsequent channel recovery. 5. Channel instability in a forested catchment The three periods of channel change identified along Jones Creek since 1972 are shown schemati- cally in Fig. 8. It must be noted that the processes documented within these periods have not occurred in isolation, but have been part of a continuum of change as a result of alterations to variables within the fluvial system. Prior to destabilisation Jones Creek had a symmetrical cross-sectional form with a mean width of 15.1 m and cross sectional area of 2 ® .17.2 m Fig. 9 . By 1983, bedlevel lowering had increased mean channel depth and mean channel cross-sectional area around 100%. This resulted in an estimated increase in bedslope from 0.0033­0.0037 ®mrm in 1972 to 0.0044 mrm in 1983 around . ® .30% . Estimated specific stream power v values for Jones Creek prior to destabilisation ranged from y2 ® .30­35 Wm Table 6 . This falls within approxi- ® .mations by Nanson and Croke 1992 for medium energy floodplains and is on the threshold of channel ® .`stability' presented by Brookes 1990 . During the first phase of instability, estimated specific stream power increased by up to five times, as bedlevel lowering increased mean depth, greatly increasing ®the capacity of the system to transport sediment cf., .Brizga and Finlayson, 1990 . Between 1983­1992 the mean channel width of Jones Creek increased by a further 70%, while mean depth was reduced by around 16%. As the bedslope ® .increased during channel incision Phase 1 , in- creased energy within Jones Creek eroded the bed and banks, resulting in the input of large volumes of sediment. The channel was unable to maintain a high sinuosity given the high stream powers and the increased sediment load. Hence, the channel straight- Table 5 Volumes of sediment excavated in the periods of channel change in Jones Creek 1972­1997 Period of Total volume Proportion of Dominant process Volume Volume Location of Proportion channel of sediment sand size of siltrmud of sand sediment of stored 3 3 ) 3® . ® . ® .change eroded m sediment flushed m stored m storage sediment 3® .eroded m available to be reworked 3® .m 1972­1983 65,400 37,932 bedlevel incision 27,468 ? ? ? 1983­1993 84,700 49,126 channel widening 35,574 ? ? ? 1993­1997 21,000 12,180 lateral activity 8820 29,950 and 3170 realignment 11,592 features and bed storage 1972­1997 171,100 99,238 NA 71,862 33,120 NA 11,592 ? refers to an unknown volume of sediment or unknown location of sediment storage. ® .Sediment budget is based on the assumption that the mud fraction has been flushed through the system Sandrmud ratios58:42 . ( )T.J. Cohen, G.J. BrierleyrGeomorphology 32 2000 109­128122 Fig. 8. Schematic diagram of the 3 phases of channel change in Jones Creek from 1972 to 1997. ( )T.J. Cohen, G.J. BrierleyrGeomorphology 32 2000 109­128 123 Fig. 9. Downstream view of a 1972 channel in Jones Creek, prior to destabilisation. Note the narrow symmetrical channel. ened its course, reducing its sinuosity from 1.71 in 1983 to 1.56 in 1992, thereby further increasing bedslope. This period of channel adjustment is termed Phase 2. Channel changes in this phase can be related to known floods in 1983, 1985, 1988 and 1992. As a result of these planform changes, the width:depth ratio of Jones Creek in 1992 had in- creased by 74% since 1972. The dimensions of the enlarged channel virtually preclude floodplain inun- dation, effectively concentrating the geomorphic im- pacts of high magnitude events within the channel ®zone Brizga and Finlayson, 1990; Nanson and .Croke, 1992 . ® .Phase 3 1992 to present has been a period of ongoing channel expansion and straightening, with a ® .reduction in sinuosity to 1.5 Fig. 10 . Estimated specific stream powers are approximately four times higher than in 1972. There has been continued aggra- Table 6 Changes in estimated bedslope, discharge and streampower in Jones Creek 1972­1997 Mean 1972 Channel 1983 Channel 1993 Channel 1997 Channel % Change 1972­1997 Slope 0.0033­0.0037 0.0044 0.0047 0.0046 q24­39.4 ® . ® .Lc estimated length of channel m 4000­3500 3330 3070 3000 y14­25 ® .Estimated drop in elevation m 13.06 14.56 14.4 13.9 y6.5 3 y1® .Estimated bankfull discharge m s 15.1 70 118.4 132.7 q778 Estimated Manning's n 0.07 0.05 0.05 0.05 y28.6 y2® .Bagnold's stream power W m 29.9­35.4 185.7 171.8 174.8 q394­485 Discharge estimates used for Bagnold's stream power are based on the Manning's equation. q indicates an increase in a channel attribute. Slope estimates for 1972­1983 based on changes to elevation associated with bedlevel indicator data. ( )T.J. Cohen, G.J. BrierleyrGeomorphology 32 2000 109­128124 Fig. 10. Upstream view of the contemporary channel in Jones Creek highlighting the widened nature of the current channel. dation of realignment features and bed-level aggrada- tion, with localised bed-level degradation. These changes in channel form are a result of known floods in 1995 and 1998. The change in channel pattern of Jones Creek conforms to classical notions of complex response ® .within incised channels cf., Schumm et al., 1984 . Initial incision increased channel depth, bedslope and ® .unit stream power Phase 1 . As degradation slowed, channel widening occurred to disperse available en- ®ergy and achieve a degree of stability Jackson and .Beschta, 1984; Schumm et al., 1984; Simon, 1992 , resulting in a reduction in sinuosity. This supplied large volumes of sediment to the channel as part of a negative feedback system, where the channel ag- ®grades as it adjusts to new energy gradients Phase .2 . The development of alternate bars and point bars enhances the widening process by promoting lateral adjustment. This is the initial step in the eventual ®development of a sinuous inner channel Schumm et .al., 1984 . In Jones Creek, the present behaviour is characterised by continued expansion, lateral adjust- ment, downstream shifts of the erosional foci and the ® .deposition of alternate bars Phase 3 . The channel-floodplain relationship along lower Jones Creek has been fundamentally transformed since 1972. Prior to incision, channel changes in Jones Creek resulted in cutoffs forming and then infilling via overbank and backfilling processes. Sed- iment composition of these channel fills is highly variable, ranging from 25­78% mud. However, channel fill samples from 1983 realignment features and cutoffs show mud fractions that range from ® .3­5% cf., Erskine et al., 1992 . The confinement of flood flows within the enlarged channel, and associ- ated increases in stream power, have resulted in realignment features and cutoffs which are com- prised of medium-coarse sands. This is a likely consequence of an increase in the grain size that is transported as suspended load. It is not possible to accurately assess rates of channel fill in Jones Creek prior to channel incision. ( )T.J. Cohen, G.J. BrierleyrGeomorphology 32 2000 109­128 125 However, field observations of shallow depths of fill ® .in 1972 channels 1­1.5 m contrast starkly with the maximum depth of aggradation in 1983 realignment ® .features and cutoffs 2.7­3.0 m . This indicates that there has been a maximum annual aggradation rate in realignment features of 190­215 mm yry1 since 1983. However, aggradation rates in Jones Creek are episodic, due the ephemeral nature of the system. This suggests that the realignment features have formed rapidly in a small number of events since 1983. Rapid deposition at the channel margin has formed an incipient floodplain which is now sta- bilised by A. mearnsii and P. ensiformis. This has resulted in coarser grained facies proximal to the channel throughout the channel network. Channel adjustments along Jones Creek reflect the sensitive balance between a forested subcatchment ® .Jones Creek and a trunk stream prone to channel ® .expansion Genoa River . It is uncertain how charac- teristic the style of trunk stream expansion of the Genoa River in 1971 was, or whether it represents accelerated rates of channel expansion as a result of human impacts in Wangarabell Reach. Erosional scars on the Genoa floodplain suggest that periodic reworking of discontinuous floodplains is a recurrent component of floodplain processes within this mixed load system. However, given the presence of numer- ous palaeochannels along Jones Creek, with dimen- sions akin to the 1972 channels, it is reasonable to assume that this style of tributaryrtrunk stream in- stability occurs infrequently. Between 1972­1983 approximately 1.5 m of bed degradation occurred along lower Jones Creek as a secondary response to trunk stream controls. The destabilisation of the fully vegetated riparian zone of Jones Creek was preconditioned by the 1971 flood, which removed the tributary confluence bar and shortened the length of Jones Creek. Catastrophic ®widening andror bedlevel lowering i.e., changes to .bed sediment storage in the Genoa River initiated dramatic changes in channel morphology of the allu- vial Jones Creek tributary. As the bed-level of Jones Creek adjusted to new energy gradients, the system became destabilised. Such a threshold response has been documented on tributaries of the Mississippi ® .River Schumm et al., 1984 , and elsewhere in Aus- ®tralia e.g. the Avon River, Victoria; Erskine et al., .1990 . A discernible lag of up to 7 years was evident between widening of the trunk stream and destabili- sation of the tributary, conditioned by the timing of ®subsequent flood events on the tributary cf., Schumm .et al., 1984; Kochel, 1988; Erskine et al., 1990 . Based on rainfall records, localised flood intensity in Jones Creek is inferred for 1975 and 1978. Indeed, the 1978 flood event along Genoa River reflected the highest 48 h rainfall over the 25 year record. It is inferred that upstream-progressing degradation in Jones Creek was the dominant control in initiating bedlevel incision and is confirmed by tributaries within the catchment displaying knickpoints. As ® .Galay 1983 noted, however, upstream-progressing degradation may often be accompanied by down- stream-progressing degradation. In Jones Creek this may have occurred as a result of the inferred lo- calised flood intensities between 1975 and 1978. Changes in the channel slope to valley slope relationship have been documented as an important ®control on channel form and behaviour Erskine et al., 1990; Schumm, 1993; Schumm et al., 1972, .1984, 1996 . Steep valleys with meandering channels carrying a mixed load that undergo bed degradation experience rapid changes to channel morphology as bedslope adjusts to valley slope. It is suggested that the valley slope to channel slope relationship in ® .Jones Creek was near a threshold Schumm, 1979 , ®whereby the increase in channel slope approxi- .mately 30% associated with bedlevel lowering sig- nificantly altered the channel pattern. In Jones Creek, ®changes in mean depth were considerable exceeding the average depth of the root zone of riparian vegeta- .tion , resulting in widespread bank instability and channel metamorphosis. From these data, changes to channel depth and associated increases in bedslope have been the dominant controls on subsequent ad- justments to channel morphology in Jones Creek. 6. Channel recovery in a forested catchment System recovery in Jones Creek is dependent on within-channel aggradation and subsequent stabilisa- tion of depositional surfaces. The deposition and colonisation of channel marginal features or incipient floodplains are part of this process. Long term chan- nel recovery is dependent on the reduction of stream ® .power, increase in sinuosity within a wider channel , ( )T.J. Cohen, G.J. BrierleyrGeomorphology 32 2000 109­128126 decrease in channel width, and subsequent reconnec- tion of the channel to its floodplain, so that flood- ® .plain inundation results Schumm et al., 1984 . Based on volumetric analysis undertaken in this study 33% of the sand sized material eroded in the periods of channel change is presently stored within the channel in realignment features, cutoffs, point bars and bed storage. The storage of this material is part of the ® .recovery process, as noted by Williams 1978 , ® . ® .Nadler and Schumm 1981 and Eschner et al., 1983 who have highlighted the role of vegetation in sedi- ment storage and the reduction in channel capacity. Further analysis of this 33% shows that 65% of this stored material is `locked up' in vegetated realign- ment features and unavailable to be reworked. Rates of vegetative colonisation of depositional surfaces are extremely high in Jones Creek with A. mearnsii being the dominant early successional species. Each year this species sets seed prolifically, covering the bed of the channel. Greater vegetation cover increases the roughness and trapping capacity of the channel zone, thereby reducing flow velocity, stream power and long term sediment flux, and promoting further channel recovery. The rate at which colonising species grow and withstand burial is an important aspect to the stabilisation of realignment features. Trees aged between 15 and 13 years have heights of 10­15 m, with diameters up to 25 cm. While A. mearnsii is an important successional species, secondary canopy species with similar growth rates, such as E. elata and E. iminalis, provide the longer term stabilisation of these inset floodplains. Other secondary species, such as Po- maderris apera, L. longifolia and P. ensiformis, result in these surfaces becoming densely vegetated, further enhancing their stability. While not quantified within this study, LWD, log jams and within-channel vegetation provide impor- tant roughness elements that reduce flow velocity ®and stream power in Jones Creek cf., Hupp and .Osterkamp, 1985, 1996; Friedman et al., 1996 . Four rush and sedge species tend to dominate and grow in the sand bed, on bars and within LWD. These are Juncus usitatus, Cyperus eragrostis, Phragmites aus- tralis and L. longifolia. Other successional species occur within the channel as a result of bank failure which introduces floodplain alluvium into the chan- nel. Channel recovery in Jones Creek is seemingly being achieved by restabilisation on a reach by reach basis, as certain reaches experience bed aggradation and reduced rates of bank erosion. This has allowed within-channel and channel marginal species to es- tablish. While recovering reaches remain susceptible to sediment transfer, variations in within-reach sedi- ment storage will not result in significant changes in channel geometry or channel position. Once parts of the channel network have been stabilised, and as sediment flux is reduced, a sinuous inner channel will develop, allowing the channel margin to become vegetated. This process is co-dependent on sediment depletion rates from upstream and the stabilisation by vegetation of the inset channel zone. 7. Conclusion This study has provided an insight into channel response in a forested catchment to flood distur- bances induced at the trunk stream confluence. In Jones Creek, channel metamorphosis was a lagged response to flood activity on the Genoa River. Inci- sion and subsequent channel expansion were not a direct response to the 1971 flood. Rather, channel widening of the Genoa River at Jones Creek conflu- ence effectively shortened the course of the creek in this forested tributary catchment and primed the tributary for change. Subsequent floods, most likely in 1975 and 1978, induced dramatic channel adjust- ments along the tributary river. The over-riding con- trol on the pattern and extent of channel adjustments was probably induced by changes to the channel ® .bedslope associated with increases in depth , as exceedance of a stability threshold induced a series of secondary channel adjustments. The sensitivity in the relationship between the Genoa River and Jones Creek highlights that landscapes in southeastern Aus- tralia can be on the threshold of instability, only requiring a suitable trigger. The style of response documented within this forested setting conforms to the notion of a complex response scenario for incised channels. However, the character of lateral adjustment and the formation of ®realignment features forming an incipient flood- .plain do not necessarily conform to simple cutoffrstraightening models. Indeed the spatial vari- ( )T.J. Cohen, G.J. BrierleyrGeomorphology 32 2000 109­128 127 ability of channel morphology seen within the study area highlights the non-uniformity in response to breaches in thresholds. Feedback and recovery mech- anisms within the incised, `natural' system have been documented. Sediment storage associated with within-channel vegetation and large woody debris has initiated the early stages of channel recovery and is an aspect of incised channel behaviour that has not been previously been documented in the Australian landscape. Further studies of alluvial rivers in forested sys- tems in Australia will improve our understanding of the `natural' range of river behaviour in southeastern Australia and thus provide an assessment of river character and the variability of processes that oc- curred prior to European settlement. Acknowledgements We thank the Logan family for their hospitality and their insight into Jones Creek and Sarah McGirr, Andrew Brooks, John Jansen, Kirstie Fryirs, Mal- colm Tomkins for assistance in the field. David ® .Cameron DNRE provided botanical advice on Jones Creek. Support for this project was provided by the ® .then East Gippsland River Management Board, River Basin Management Society and I.D.&A. Criti- cal review by Edward Keller and Ellen Wohl greatly improved the presentation of this manuscript. References Brierley, G.J., Fryirs, K., 1998. A fluvial sediment budget for Upper Wolumla Creek, South Coast, New South Wales, Aus- ® .tralia. Aust. Geog. 29 1 , 107­124. Brierley, G.J., Fryirs, K., Cohen, T.J., 1996. Geomorphology and river ecology in southeastern Australia: an approach to catch- ment characterisation. Part one, Working Paper 9603, pp. 1­54. Brizga, S.O., Finlayson, B.L., 1990. Channel avulsion and river metamorphosis: the case of the Thomson River, Victoria, Australia. Earth Surf. Process. Landforms 15, 391­404. Brookes, A., 1990. Restoration and enhancement of engineered river channels: some European experiences. Reg. Rivers Res. and Manag. 5, 45­56. Brooks, A.P., Brierley, G.J., 1997. Geomorphic responses of lower Bega River to catchment disturbance, 1851­1926. Geo- morphology 18, 291­304. Chesterfield, E.A., Taylor, S.J., Molnar, C.D., 1990. Recovery after wildfire: warm temperate rainforest at Jones Creek. Arthur Rylah Institute for Environmental Research, Technical Report Series, Melbourne, Victoria, 101: 1­27. ® .Chorley, R.J., Schumm, S.A., Sugden, D.E. Eds. , Geomorphol- ogy Methuen & Co., London, pp. 1­607. Cohen, T.J., 1997. Channel instability in a forested catchment and the role of coarse woody debris in channel adjustments: Jones Creek, East Gippsland, Victoria. Unpublished B.Sc. Honours Thesis, Macquarie University, School of Earth Sciences, pp. 1­156. Erskine, W.D., 1992. An investigation of sediment sources in the Genoa River catchment. In: East Gippsland River Manage- ment Board, Mallacoota, Victoria, pp. 1­88. Erskine, W.D., 1993. Erosion and deposition produced by a catastrophic flood on the Genoa River, Victoria. Aust. J. Soil. ® .Water. Cons. 6 4 , 35­43. Erskine, W.D., I.D.&A., 1997. Cann River: geomorphic assess- ment and implications for stream management. East Gippsland River Management Board and Department of Natural Re- sources and Environment, pp. 1­100. Erskine, W.D., Rutherford, I.D., Tilleard, J.W., 1990. Fluvial geomorphology of tributaries to the Gippsland Lakes. Ian Drummond and Associates, Wangaratta, Victoria, for Depart- ment of Conservation and Environment, Victoria, pp. 1­186. Erskine, W.D., McFadden, C., Bishop, P., 1992. Alluvial cutoffs as indicators of former channel conditions. Earth. Surf. Pro- cess. Landforms 17, 23­37. Eschner, T.R., Hadley, R.F., Crowley, K.D., 1983. Hydrologic and morphological changes in channels of the Platte River basin in Colorado, Wyoming and Nebraska: a historical per- spective. US Geol. Surv. Prof. Paper, 1277-A, pp. 1­39. Friedman, J.M., Osterkamp, W.R., Lewis, W.M., 1996. The role of vegetation and bed-level fluctuations in the process of channel narrowing. Geomorphology 14, 341­351. Fryirs, K., Brierley, G.J., 1999. Slope-channel decoupling in Wolumla catchment, NSW, Australia: the changing nature of sediment sources following European settlement. Catena 35, 41­63. Galay, V.J., 1983. Causes of river bed degradation. Water Resour. ® .Res. 19 5 , 1057­1090. Hupp, C.R., Osterkamp, W.R., 1985. Bottomland vegetation dis- tribution along Passage Creek, Virginia, in relation to fluvial ® .landforms. Ecology 66 3 , 670­681. Hupp, C.R., Osterkamp, W.R., 1996. Riparian vegetation and fluvial geomorphic processes. Geomorphology 14, 277­295. Jackson, W.L., Beschta, R.L., 1984. Influences of increased sand delivery on the morphology of sand and gravel channels. Water Resour. Bull. 4, 527­533. Keller, E.A., Swanson, F.J., 1979. Effects of large organic mate- rial on channel form and fluvial processes. Earth Surf. Process. 4, 361­380. Kochel, R.C., 1988. Geomorphic impact of large floods: review and new perspectives on magnitude and frequency. In: Baker, ® .V.R., Kochel, R.C., Patton, P.C. Eds. , Flood Geomorphol- ogy. Wiley, Toronto, Canada, pp. 169­187. Loyn, R.H., Cameron, D.G., Traill, B.J., Sloan, S.F., Malone, B.S., Schulz, M., Earl, G.E., Triggs, B.E., 1992. Flora and fauna of the Cooaggalah Forest Block, East Gippsland, Victo- ( )T.J. Cohen, G.J. BrierleyrGeomorphology 32 2000 109­128128 ria. Department of Conservation and Environment. Ecological survey report, 20, pp. 1­129. Nadler, C.T., Schumm, S.A., 1981. Metamorphosis of South Platte and Arkansas Rivers, eastern Colorado. Phys. Geog. 2, 95­115. Nakamura, F., Swanson, F.J., 1993. Effects of coarse woody debris on morphology and sediment storage of a mountain stream in western Oregon. Earth Surf. Process. Landforms 18, 43­61. Nanson, G.C., Croke, J.C., 1992. A genetic classification of floodplains. Geomorphology 4, 459­486. Osterkamp, W.R., Costa, J.E., 1987. Changes accompaning an extraordinary flood on a sand-bed stream. In: Mayer, L., Nash, ® .D. Eds. , Catastrophic flooding. Allen & Unwin, pp. 201­224. Prosser, I.P., Chappell, J.M.A., Gillespie, R., 1994. Holocence valley aggradation and gully erosion in headwater catchments, southeastern highlands of Australia. Earth Surf. Process. Land- forms 19, 465­480. Schumm, S.A., 1979. Geomorphic thresholds: the concept and its applications. Transactions of the Institute of British Geogra- phers NS4, 485­515. Schumm, S.A., 1993. River response to baselevel change: implica- tions for sequence stratigraphy. J. Geol. 101, 279­294. Schumm, S.A., Lichty, R.W., 1963. Channel widening and flood- plain construction along Cimarron River in southwestern Kansas. US Geol. Surv. Prof. Paper, 352-D, pp. 71-88. Schumm, S.A., Khan, H.R., Winkley, B.R., Robbins, L.G., 1972. ® .Variability of river patterns. Nature Physical Science 237, 75­76. Schumm, S.A., Harvey, M.D., Watson, C.C., 1984. In: Incised Channels -- Morphology, Dynamics and Control. Water Re- sources Publications, Littleton, Colorado, pp. 1­200. Schumm, S.A., Erskine, W.D., Tilleard, J.W., 1996. Morphology, hydrology, and evolution of the anastomosing Ovens and King ® .Rivers, Victoria, Australia. GSA Bull. 108 10 , 1212­1224. Simon, A., 1989. A model for channel response in disturbed alluvial channels. Earth Surf. Process. Landforms 14, 11­26. Simon, A., 1992. Energy, time, and channel evolution in catas- trophically disturbed fluvial systems. Geomorphology 5, 345­ 372. Tooth, S., Nanson, G.C., 1995. The geomorphology of Australia's fluvial systems: retrospect, perspect and prospect. Progr. Phys. ® .Georg. 19 1 , 35­60. Williams, G.P., 1978. The case of shrinking channels -- the North Platte and Platte Rivers in Nebraska. US Geol. Surv. Circular 781, 1­48. Wolman, W.G., 1954. A method of sampling coarse river-bed material. Am. Geophys. Union Trans. 36, 951­956.