Introduction to EdGCM EdGCM User Interface • Toolbar • Setup Simulation window • Analyze Output window • Panoply mapping tool EdGCM Toolbar Pause Run Start/Resume Run List of all runs Create new run setup Duplicate existing setup for modification Setup an EdGCM Run • Highlight any run from list • Open its Setup Simulation window (top menu bar → “Window” → “Setup Simulations”) • In toolbar, click “New” button • New Setup window opens • Enter IDs, start & end dates Input File Setup • Choose input folder time period (in setup window) • For near past, present, & near future runs, use “Modern” • Choose reference year to match start date • Leave initial & boundary conditions at default Ocean Mode Options • “Predict SST” lets model predict SSTs throughout the run • “Specify SST” uses observed SSTs, should not be used for future or paleoclimate runs • Leave other ocean options at default Setup Forcings • Use “observed” values - enter year & click “Set” • Or enter values of your choice • Solar luminosity values available 1500 – 1998 • GHG values available 1850 – 2050 – 1850-1957: ice core bubbles – 1958-2000: observed – 2001-2050: projections • Entered values remain constant throughout run, unless . . . Forcings Trend Setup • Enable trend(s) to change values over time • For solar luminosity & each GHG • Choose trend type (i.e. linear, exponential) • Enter change per year • Enter start & end years of trend • Note: start & end years of trend(s) not confined to start & end dates of run • Click “View” icon to see values trend produces Run the Model • After setup, highlight run ID in run list • Click start button • Calculates one cycle, then stops • Click start button again to finish run • Can pause run any time & resume later • When complete, close & restart EdGCM (necessary to analyze output) Analyze Output: Tables • Highlight run in list • Open its Analyze Output window (top menu bar → “Window” → “Analyze Output”) • Select “Tables” tab • Select start & end years for averaging • Click “Average” button • Check boxes of time period averages to view (months, seasons, annual) • Click “Get Tables” button • Highlight table name & click “View” Analyze Output: Plots • Analyze Output window → “Plots” tab • Select start and end years • Click “Time Series” button • Select variables to plot • Click “Get Plots” • Highlight plot name you wish to view • Click “View” • Excel opens & data may be easily plotted Analyze Output: Maps • Analyze Output window → “Maps” tab • Select start & end years for averaging • Click “Average” • Select time period(s) to map (i.e. annual) • Select variables to map • Click “Get Maps” • Highlight time period in “Viewable Maps” list • Click “View” Panoply Mapping Tool • After clicking “View”, Panoply opens • Highlight map name • Click “Create Plot” • Many map options to choose from • Drop down box to change time period mapped (i.e. ANN, DJF, JAN) • Note: map will be lost if you close map window without saving Analyze Output: Vertical • In Analyze Output window, “Vertical” tab • Procedure is similar to “Maps” tab • Vertical profile also uses Panoply • Zonal averages depicted in profile Known Problems • First calendar year of any run cannot be analyzed • SST cannot be mapped • Map images do not save well • In some cases, data for a certain range of years cannot be averaged for analysis • Vertical profile variable check boxes are off by one Sample Run • Start: 12/01/2005 End: 12/31/2007 • Input folder: Modern • Reference Year: 2005 • Predict SST • Choose to generate monthly average data tables • Solar: 1998 value • GHGs: 2005 values • Choose to enable CO2 trend • Linear (ppm) trend • 2.75 ppm CO2 change per year (~2x current rate) • Trend From: 2006 To: 2007