TLAMSA, Jiří, Jiří ROUT a Martin KNÍŽEK. Implementation of geological exploration works in the environment of rocks mass with strong tectonics disturbance in the area of Červený vrch/Bořislavka station on the new metro line V.A in Prague. Online. In Butovič, A., Hilar, M., Škopková, I., Zlámal, J. 12th International Conference Underground construction Prague 2013, Proceedings. 2013. vyd. Praha: Česká tunelářská asociace ITA-AITES, 2013. s. 1-5. ISBN 978-80-260-3868-9. [citováno 2024-04-24]
Další formáty:   BibTeX LaTeX RIS
Základní údaje
Originální název Implementation of geological exploration works in the environment of rocks mass with strong tectonics disturbance in the area of Červený vrch/Bořislavka station on the new metro line V.A in Prague
Autoři TLAMSA, Jiří (203 Česká republika), Jiří ROUT (203 Česká republika) a Martin KNÍŽEK (203 Česká republika, garant, domácí)
Vydání 2013. vyd. Praha, 12th International Conference Underground construction Prague 2013, Proceedings, od s. 1-5, 5 s. 2013.
Nakladatel Česká tunelářská asociace ITA-AITES
Další údaje
Originální jazyk angličtina
Typ výsledku Stať ve sborníku
Obor 10500 1.5. Earth and related environmental sciences
Stát vydavatele Česká republika
Utajení není předmětem státního či obchodního tajemství
Forma vydání paměťový nosič (CD, DVD, flash disk)
Kód RIV RIV/00216224:14310/13:00069017
Organizační jednotka Přírodovědecká fakulta
ISBN 978-80-260-3868-9
Klíčová slova anglicky underground construction; geotechnics; geological exploration
Štítky Fault slip
Příznaky Mezinárodní význam
Změnil Změnil: Mgr. Martin Knížek, Ph.D., učo 63755. Změněno: 14. 8. 2013 15:57.
Anotace
Červený Vrch/Bořislavka station is located on the new metro line V.A in Prague and was designed as one-vault mined station with a length of 193 m and cross section about 224 m2. The station with a total overburden of 15 - 22 m is situated under a busy street Evropská with central tram lane and many high buildings in close surrounding. In a short time before the scheduled start of the excava-tion additional exploration works in the area of the station were carried out. These exploration works, together with the results of the access adit geological mapping, discovered diametrically different geo-logical conditions than originally anticipated. Instead of the expected massive quartzites throughout the area of the station an occurrence of shales of varying degree of weathering and intensive tectonic disturbance with only rare quartzite layers was found out. Newly detected significantly less favourable geotechnical conditions led to a need to modify the project to ensure the stability of the underground excavation, to adaptation of excavation process and design of a number of other construction-technical measures. Evaluation of the results of comprehensive geotechnical monitoring and geological mapping of progressive excavation of the station enabled retrospectively evaluate the findings of the exploratory works in the form of structure-geological model of the rock mass and determination of its geotechnical parameters. The issue of project preparation and excavation process of Červený Vrch/Bořislavka sta-tion well illustrates the need to follow the basic rules for implementing of geological exploration works, especially to perform surveys in several successive stages in an adequate scale and sufficiently in ad-vance before the start of the construction.