TÓTH, Šimon a Dalibor KLUSÁČEK. User-Aware Metrics for Measuring Quality of Parallel Job Schedules. In Walfredo Cirne and Narayan Desai. Job Scheduling Strategies for Parallel Processing. 1. vyd. Switzerland: Springer, Lecture Notes in Computer Science 8828, 2015, s. 90-107. ISBN 978-3-319-15788-7. Dostupné z: https://dx.doi.org/10.1007/978-3-319-15789-4_6.
Další formáty:   BibTeX LaTeX RIS
Základní údaje
Originální název User-Aware Metrics for Measuring Quality of Parallel Job Schedules
Autoři TÓTH, Šimon (203 Česká republika, garant, domácí) a Dalibor KLUSÁČEK (203 Česká republika, domácí).
Vydání 1. vyd. Switzerland, Job Scheduling Strategies for Parallel Processing, od s. 90-107, 18 s. 2015.
Nakladatel Springer, Lecture Notes in Computer Science 8828
Další údaje
Originální jazyk angličtina
Typ výsledku Stať ve sborníku
Obor 10201 Computer sciences, information science, bioinformatics
Stát vydavatele Německo
Utajení není předmětem státního či obchodního tajemství
Forma vydání tištěná verze "print"
WWW URL
Impakt faktor Impact factor: 0.402 v roce 2005
Kód RIV RIV/00216224:14330/15:00080586
Organizační jednotka Fakulta informatiky
ISBN 978-3-319-15788-7
ISSN 0302-9743
Doi http://dx.doi.org/10.1007/978-3-319-15789-4_6
UT WoS 000355729800006
Klíčová slova anglicky Grid; Performance evaluation; Metrics; Queue-based scheduling; Fairness; User-aware scheduling
Štítky best1, firank_A
Příznaky Mezinárodní význam, Recenzováno
Změnil Změnil: RNDr. Pavel Šmerk, Ph.D., učo 3880. Změněno: 28. 4. 2016 13:40.
Anotace
The work presented in this paper is motivated by the challenges in the design of scheduling algorithms for the Czech National Grid MetaCentrum. One of the most notable problems is our inability to efficiently analyze the quality of schedules. While it is still possible to observe and measure certain aspects of generated schedules using various metrics, it is very challenging to choose a set of metrics that would be representative when measuring the schedule quality. Without quality quantification (either relative, or absolute), we have no way to determine the impact of new algorithms and configurations on the schedule quality, prior to their deployment in a production service. The only two options we are left with is to either use expert assessment or to simply deploy new solutions into production and observe their impact on user satisfaction. To approach this problem, we have designed a novel user-aware model and a~metric that can overcome the presented issues by evaluating the quality on a~user level. The model assigns an expected end time (EET) to each job based on a fair partitioning of the system resources, modeling users expectations. Using this calculated EET we can then compare generated schedules in detail, while also being able to adequately visualize schedule artifacts, allowing an expert to further analyze them. Moreover, we present how coupling this model with a job scheduling simulator gives us the ability to do an in-depth evaluation of scheduling algorithms before they are deployed into a production environment.
Návaznosti
GAP202/12/0306, projekt VaVNázev: Dyschnet - Dynamické plánování a rozvrhování výpočetních a síťových zdrojů (Akronym: Dyschnet)
Investor: Grantová agentura ČR, Dyschnet - Dynamické plánování a rozvrhování výpočetních a síťových zdrojů
MUNI/A/1159/2014, interní kód MUNázev: Rozsáhlé výpočetní systémy: modely, aplikace a verifikace IV.
Investor: Masarykova univerzita, Rozsáhlé výpočetní systémy: modely, aplikace a verifikace IV., DO R. 2020_Kategorie A - Specifický výzkum - Studentské výzkumné projekty
VytisknoutZobrazeno: 25. 4. 2024 16:04